Called when the job scheduler connection with the coordinator is interrupted. Attempts to reestablish a connection with the coordinator until either a connection is obtained or the maximum number of attempts to reconnect has been reached.
Namespace: AGI.Parallel.Client
Assembly: AGI.Parallel.Client (in AGI.Parallel.Client.dll) Version: 1.2.0.275 (1.2.0.275)

Syntax

C#
public void OnCoordinatorDisconnected()
Visual Basic
Public Sub OnCoordinatorDisconnected

See Also