Click or drag to resize

ParameterizedEvaluatorWithIntervalsTResult, TResultOverIntervalsEvaluate Method

Overload List
  NameDescription
Public methodEvaluate(JulianDate)
Evaluates this parameterized evaluator.
Public methodEvaluate(TimeIntervalCollection, ITrackCalculationProgress)
Evaluates this parameterized evaluator over the collection of considered time intervals.
Top
See Also